BIM Execution Plan & BEP Services

Define how BIM will actually be delivered on the project — including BIM uses, team responsibilities, model structure, LOD and LOI, coordination procedures, information exchanges, QA requirements and digital handover expectations.

BIM Uses Responsibility Matrix LOD / LOI Model Federation Clash Matrix CDE Workflow
Define BIM Uses & Scope
Assign Responsibilities
Control Exchanges & QA
Deliver Required Information
BIM Execution Planning

A BIM Requirement Needs an Execution Framework

A project may require BIM, but that requirement alone does not define how different teams should work together.

The BIM Execution Plan converts high-level digital requirements into project-specific procedures for modeling, coordination, information exchange, quality control and delivery.

It provides the practical operating framework that connects BIM expectations with day-to-day project execution.

BIM Execution Plan and project digital delivery planning
Requirements → Responsibilities → Workflow → Delivery BIM execution structured around project-specific information requirements.
BEP Development Capabilities

Define the Rules for Project BIM Delivery

The level of detail within a BEP should match project complexity, procurement strategy, BIM requirements and delivery stage.

01 / OBJECTIVES

BIM Goals & Uses

Define project-specific BIM objectives and intended digital uses.

02 / ROLES

Team Responsibilities

Clarify responsibilities for model creation, review, coordination and information delivery.

03 / MODEL

Model Breakdown Strategy

Define project models by discipline, building, zone, package or delivery need.

04 / DEVELOPMENT

LOD / LOI Requirements

Establish required geometry and information development at defined project stages.

05 / STANDARDS

Modeling Standards

Define naming, structure, reference and model conventions.

06 / COORDINATES

Coordinate Strategy

Establish project origin, reference and federation expectations.

07 / COORDINATION

Coordination & Clash Protocol

Define federation, test structure, issue assignment and closure workflow.

08 / EXCHANGES

Information Exchange Planning

Define required model and data exchanges at project milestones.

09 / QA

QA & Delivery Gates

Establish checks required before information is issued or accepted.

Core BEP Structure

Typical Sections Within a BIM Execution Plan

SECTION 01 Project Information Project scope, participants and digital-delivery context.
SECTION 02 BIM Goals Project-defined BIM objectives and expected outcomes.
SECTION 03 BIM Uses Coordination, documentation, sequencing, quantities, handover or other agreed uses.
SECTION 04 Project Roles BIM-related project responsibilities and contacts.
SECTION 05 Model Structure Discipline, building, zone and package organization.
SECTION 06 Information Requirements Required model geometry, data and information content.
SECTION 07 Coordination Process Federation, issue review, meetings and clash workflow.
SECTION 08 Delivery Requirements Required files, milestones, review gates and final handover.
Model Responsibility Matrix

Define Who Is Responsible for Which Information

Coordination becomes difficult when multiple teams assume someone else owns a model element, interface or decision.

Architecture Define responsibility for architectural model information and interfaces.
Structure Define responsibility for structural model information and coordination.
Mechanical Define responsibility for HVAC equipment, ductwork and relevant systems.
Electrical Define responsibility for electrical equipment, containment and system information.
Plumbing Define responsibility for plumbing model information and related interfaces.
Fire Protection Define responsibility for project-specific fire-protection model information.
Specialist Systems Clarify ownership for vendor, specialist or delegated-model content.
Coordination Define who federates models, manages issues and verifies closure.
Execution Control

A Detailed BEP Is Not Useful If the Project Team Does Not Follow It

The purpose of a BEP is not to create a long document that sits unused.

It should create practical rules that project teams can apply consistently throughout delivery.

Requirements Must Be Clear Teams need to understand what information must be produced.
Responsibilities Must Be Assigned Model ownership and issue ownership should not remain ambiguous.
Exchanges Must Be Controlled Model exchanges should follow defined milestones and revision controls.
QA Must Be Repeatable Review criteria should be clear enough for consistent application.
BEP Development Workflow

From Project Requirements to an Executable BIM Plan

01

Review

Review project BIM requirements, scopes and delivery objectives.

02

Define

Establish BIM uses, deliverables, development levels and project roles.

03

Structure

Define models, naming, coordinates and information exchanges.

04

Coordinate

Establish federation, clash review and issue-management procedures.

05

Validate

Define QA gates, review criteria and delivery checks.

06

Maintain

Update the BEP when approved project requirements materially change.

Model Standards

Common Rules Reduce Avoidable Model Friction

File Naming

Define naming conventions for models, drawings, exports and other digital deliverables.

Model Naming

Establish consistent discipline, building, zone or package identifiers.

Views & Sheets

Define project-specific view and sheet naming where required.

Model Coordinates

Define origin, shared references and federation alignment.

Levels & Grids

Establish project expectations for reference geometry used across disciplines.

Required Parameters

Define data fields required for project-specific information uses.

Model Segmentation

Define when project models should be divided by building, zone, level or package.

Exchange Formats

Define required native, federated or project-defined exchange outputs.

Information Exchange Planning

Define What Is Exchanged, When and for What Purpose

EXCHANGE 01 Design Review Models issued for defined design-review milestones.
EXCHANGE 02 Coordination Discipline models provided for federation and coordination review.
EXCHANGE 03 Preconstruction Project information exchanged for constructability and delivery review.
EXCHANGE 04 Shop Drawing Support Approved project information used for downstream documentation.
EXCHANGE 05 Construction Updates Revised model information issued at defined project stages.
EXCHANGE 06 As-Built Updates Record information exchanged during closeout workflows.
EXCHANGE 07 Handover Final project-defined models and information prepared for delivery.
EXCHANGE 08 Operations Required asset or facility information transferred where included.
Coordination & Clash Protocol

Define How Coordination Issues Move to Closure

Model Federation Define which models are combined and how often coordination models are updated.
Clash Matrix Define which discipline interfaces require systematic clash testing.
Clash Criteria Establish relevant hard, clearance or project-defined checks.
Issue Classification Group issues by discipline, type, priority or project zone.
Issue Assignment Route coordination issues to the responsible project team.
Closure Verification Define how resolved issues are rechecked before closure.
Coordination Meetings Define frequency, participants, inputs and expected outputs.
Model Release Define the conditions required before coordinated information progresses downstream.
Revision Management Keep coordination decisions aligned with current project revisions.
Common Data Environment Workflow

Project Information Needs Clear Status & Revision Control

The BEP can define how files and models move through the project's chosen information environment.

STATE 01 Work in Progress Information under discipline development and internal review.
STATE 02 Shared Information issued for project-defined coordination or review use.
STATE 03 Published / Issued Information released through the approved project workflow.
STATE 04 Archived Superseded or historical information retained according to project requirements.
BEP Inputs & Outputs

Project Requirements In. Executable BIM Framework Out.

Typical Inputs

  • Client BIM requirements
  • Project scope information
  • Consultant scopes
  • Contractor scopes
  • Required BIM uses
  • Delivery milestones
  • Existing BIM standards
  • Model requirements
  • Coordination requirements
  • Digital handover requirements

Typical Outputs

  • Project BIM Execution Plan
  • BIM roles and responsibility matrix
  • BIM use definition
  • Model breakdown structure
  • LOD / LOI requirements
  • Naming conventions
  • Coordinate strategy
  • Information exchange requirements
  • Coordination / clash protocol
  • QA and delivery requirements
BEP QA & Delivery Gates

Define What Must Be Checked Before Information Is Issued

A project team should not need to invent acceptance criteria each time a model is delivered.

The BEP can establish repeatable checks for model readiness, coordination and information delivery.

File Naming Check models and files against defined naming rules.
Model Coordinates Confirm model alignment before federation or exchange.
LOD / LOI Review model development against project-stage requirements.
Model Health Review project-defined technical model quality requirements.
Required Information Confirm relevant parameters and information are available.
Coordination Status Confirm unresolved coordination issues are visible before release.
Revision Status Confirm deliverables reflect the intended project revision.
Delivery Completeness Confirm required files and project-defined outputs are present.
BEP Across the Project Lifecycle

Execution Requirements Can Evolve with the Project

Project Mobilization Establish BIM uses, responsibilities, standards and initial delivery procedures.
Design Control discipline model development, exchanges and design coordination.
Preconstruction Expand federation, constructability and coordination workflows.
Construction Manage project-defined coordination, updates, revisions and documentation exchanges.
Closeout Define record-model, as-built and final digital deliverables.
Handover Prepare project-defined model, drawing and asset information for downstream use.
Scope & Authority

A BEP Organizes BIM Delivery — It Does Not Transfer Professional Responsibility

The BIM Execution Plan can define workflows, information requirements, responsibilities and coordination processes.

It does not independently change contractual design authority, professional engineering responsibility, code obligations or formal project approvals unless those matters are addressed through the appropriate contractual process.

BIM Responsibility Define who creates, coordinates and delivers information.
Design Responsibility Keep professional design authority with the responsible project party.
Contractual Requirements BEP procedures should align with applicable project agreements.
Change Control Material changes to execution requirements should follow the project's agreed approval workflow.
Frequently Asked Questions

BIM Execution Plan FAQs

What is a BIM Execution Plan?

A BIM Execution Plan defines how project BIM requirements will be implemented through modeling, coordination, information exchange, quality control and digital delivery procedures.

When should a BEP be prepared?

BIM execution planning is most useful when developed early enough to guide project mobilization, modeling and coordination workflows. It may then be updated as approved project requirements evolve.

Can a BEP define LOD and LOI requirements?

Yes. The plan can define project-stage requirements for model geometry and project information based on intended BIM uses.

Can a BIM Execution Plan include a clash matrix?

Yes. The BEP can define required discipline interfaces, clash-testing expectations, review responsibilities and issue-closure procedures.

Can a BEP define Common Data Environment workflows?

Yes. Project-specific file states, revision control, information exchange and approval workflows can be documented for the selected environment.

Does a BEP replace project contracts?

No. A BEP supports project BIM execution and information management. Contractual authority, professional responsibility and formal approvals remain subject to the project's agreements and responsible parties.

BIM Execution Planning

Need a Project-Specific BIM Execution Plan?

Share your BIM requirements, project team structure, required BIM uses, coordination expectations and digital delivery milestones.