Integrated BIM, MEPF & VDC Engineering
COBie • ASSET INFORMATION • BIM HANDOVER • FACILITIES

COBie & BIM Handover Data Services

Structure project and asset information for digital handover using defined COBie or client-specific information requirements — connecting facilities, floors, spaces, equipment, asset types, systems, attributes, documents and other required operational data.

COBie Data Asset Registers Spaces Equipment Systems Data Validation
Define Required Information
Collect BIM & Asset Data
Validate Required Fields
Deliver Structured Handover
Structured Handover Information

Project Closeout Should Deliver More Than a Folder of Files

Facility teams may receive drawings, models, schedules, manuals, submittals and equipment records from multiple sources.

COBie-style structured handover organizes selected building and asset information so that key data can be transferred in a more controlled and reviewable format.

The exact data structure and acceptance criteria should always follow the actual project requirements, owner requirements, templates and contractual deliverables.

COBie and BIM handover data services
BIM + Asset Records + Facility Information → Structured Digital Handover Project-defined data prepared for review and downstream use.
COBie & Handover Capabilities

Turn Project Information into Structured Handover Data

The data scope can be aligned with supplied owner information requirements, project templates, BIM execution requirements and agreed facility-handover deliverables.

01 / REQUIREMENTS

COBie Requirement Review

Review supplied project templates, required fields, data rules and handover expectations.

02 / DATA

COBie Data Preparation

Structure project-defined facility, space, asset and equipment information.

03 / BIM

BIM-to-Handover Mapping

Connect selected model information with required handover data fields.

04 / ASSETS

Asset Information Preparation

Organize project-defined equipment, component and asset information for handover.

05 / SPACES

Facility & Space Information

Structure building, floor, space and project-defined zone information.

06 / SYSTEMS

System Information Mapping

Organize project-defined equipment relationships around required facility systems.

07 / DOCUMENTS

Document References

Structure references to supplied O&M manuals, warranties, submittals and related records.

08 / VALIDATION

COBie Data Validation

Review required fields, duplicates, references, formats and project-defined rules.

09 / CLOSEOUT

Digital Handover Support

Prepare agreed datasets, models and supporting information for final handover.

Structured Information

Typical Information Areas Within a COBie Workflow

Exact worksheets, columns, mandatory fields and project rules should follow the supplied project requirement.

DATA 01 Facility Project-defined facility and building-level information.
DATA 02 Floors Building floor or level information required for handover.
DATA 03 Spaces Required room, space and location information.
DATA 04 Zones Project-defined groupings of spaces or operational areas.
DATA 05 Types Common equipment or component type information.
DATA 06 Components Individual project-defined maintainable assets or equipment records.
DATA 07 Systems Required relationships between equipment and facility systems.
DATA 08 Documents References to supplied records, manuals and supporting information.
DATA 09 Attributes Additional project-defined properties associated with required records.
DATA 10 Contacts Project-defined contact information where required in the handover structure.
DATA 11 Spares Supplied spare-part information where included in project requirements.
DATA 12 Jobs / Tasks Project-defined operational or maintenance task information where required.
Handover Data Control

A Completed Spreadsheet Does Not Automatically Mean the Handover Data Is Correct

Every required cell can appear populated while asset IDs, locations, classifications, document references or model relationships remain incorrect.

Handover QA should therefore review the meaning and relationship of the information — not only whether a field contains text.

Field Populated Confirms data exists — not that it is correct.
Asset Match Confirm information belongs to the intended asset or component.
Location Match Verify equipment is associated with the correct space or location.
Requirement Match Check data against the actual project handover requirement.
COBie Handover Workflow

From Information Requirements to Reviewed Handover Data

01

Define

Review required fields, templates, data rules and project deliverables.

02

Collect

Gather BIM, schedules, asset registers, submittals and closeout records.

03

Map

Map source information to required handover fields.

04

Populate

Populate agreed facility, space, asset and system information.

05

Validate

Review required values, references, duplicates and relationships.

06

Deliver

Prepare the agreed handover dataset and supporting files.

Asset & Equipment Information

Connect Handover Data to the Correct Assets

ASSET 01 Asset ID Project-defined identifier connecting equipment and handover records.
ASSET 02 Asset Type Equipment category, family or project-defined type.
ASSET 03 Manufacturer Supplied manufacturer information where required.
ASSET 04 Model Reference Supplied product or equipment model information.
ASSET 05 Serial Reference Asset-specific serial information where provided.
ASSET 06 Space Required room or spatial location reference.
ASSET 07 System Project-defined facility-system association.
ASSET 08 Installation Information Supplied installation or commissioning data where required.
ASSET 09 Warranty Reference Project-provided warranty information where applicable.
ASSET 10 O&M Reference Link or reference to supplied operations documentation.
ASSET 11 Classification Project-required classification information where applicable.
ASSET 12 Status Required handover or information status reference.
Model & Data Relationship

The BIM Model and the Handover Dataset Should Describe the Same Facility

When asset information exists both in BIM and in structured handover data, the relationships should be controlled.

Equipment names, asset IDs, spaces, systems and required parameters should be reviewed so that the digital handover does not describe a different condition from the final project record.

BIM Object Represents the required digital model element.
Asset Record Carries required operational or handover information.
Shared Identifier Helps maintain the relationship between model and record.
QA Review Confirms required model-data relationships before delivery.
COBie Data Validation

Validate More Than Empty Cells

CHECK 01 Required Fields Review completion of project-defined mandatory information.
CHECK 02 Data Format Check supplied project formatting and field rules.
CHECK 03 Asset IDs Review asset identifiers for required consistency.
CHECK 04 Duplicate Records Identify duplicated equipment or conflicting data entries.
CHECK 05 Space References Confirm component locations reference intended spaces.
CHECK 06 Type Relationships Review component relationships with required equipment types.
CHECK 07 System Relationships Review required asset-to-system associations.
CHECK 08 Document References Check required supporting-document references.
CHECK 09 Model Alignment Compare key information against the agreed record model.
CHECK 10 Naming Consistency Review project-defined naming conventions across records.
CHECK 11 Source Traceability Maintain clear source references where the workflow requires them.
CHECK 12 Acceptance Requirements Review against the actual project acceptance criteria.
Inputs & Deliverables

Project Records In. Structured Handover Data Out.

Typical Inputs

  • COBie / handover template
  • Owner information requirements
  • BIM execution requirements
  • As-built BIM models
  • Equipment schedules
  • Asset registers
  • Space schedules
  • Approved submittals
  • O&M documentation
  • Commissioning / closeout records

Typical Deliverables

  • Project-defined COBie dataset
  • Structured facility information
  • Floor and space information
  • Asset / component records
  • Equipment type information
  • System relationships
  • Document references
  • Attribute information
  • Data validation report
  • Agreed digital handover package
COBie QA / QC

Check Information Before Final Handover

Structured handover data can affect downstream facility workflows, so project-defined information should be reviewed before issue.

QA can include required fields, identifiers, type relationships, spaces, systems, document references, duplicate records, source consistency and model alignment.

Required Field Check Review completion against supplied project requirements.
Asset Match Check Confirm records relate to intended equipment or assets.
Space Check Review component location references against required spaces.
Type Check Verify required asset-type relationships.
System Check Review project-defined system relationships.
Duplicate Check Identify duplicated or conflicting information records.
Document Check Review required document references against supplied files.
Model Check Compare selected handover data with the intended record model.
Information Responsibility

Define Who Supplies, Reviews & Accepts the Data

ROLE 01 Information Requirement Owner or project requirements define the expected handover information.
ROLE 02 Source Information Relevant stakeholders provide required project and asset records.
ROLE 03 Data Preparation Required information is organized into the agreed handover structure.
ROLE 04 Data Review Required checks are completed before formal issue.
ROLE 05 Clarification Missing or conflicting information is routed to responsible parties.
ROLE 06 Correction Approved updates are incorporated into the required records.
ROLE 07 Final Validation Dataset is reviewed against defined handover criteria.
ROLE 08 Acceptance Final acceptance remains subject to the project authority and contractual process.
Scope & Compliance

COBie Preparation Does Not Automatically Guarantee Contractual Compliance

MEP Global Engineering can support COBie data preparation, BIM-to-data mapping, asset information, data cleanup, validation and structured digital handover.

Final compliance depends on the exact project specification, owner information requirements, contractual requirements, required COBie version, templates, classifications, mandatory fields, validation rules and formal acceptance process.

Missing source data, equipment information, approved product records or stakeholder inputs cannot be reliably replaced by unsupported assumptions.

Project Requirement Defines what information must actually be delivered.
Source Information Forms the basis for asset and handover data.
Validation Checks the dataset against agreed project rules.
Final Acceptance Remains subject to the project's designated reviewing authority.
COBie & Handover Applications

Structured Facility Information Across Complex Building Types

Data Centers Structured handover information for equipment-intensive technical facilities.
Healthcare Asset, space and facility information supporting complex healthcare environments.
Industrial Facilities Equipment and system-focused handover information for operational facilities.
Commercial Buildings Structured building and asset information for owner handover.
Life Sciences Controlled asset and facility information for technical projects.
Semiconductor & High-Tech Equipment-rich structured handover for high-density technical facilities.
Education Facility and asset records supporting institutional building portfolios.
Hospitality Structured project and equipment data supporting hotel facility handover.
Multifamily Repeatable building and asset handover structures.
Frequently Asked Questions

COBie & BIM Handover FAQs

What is COBie?

COBie is a structured approach for organizing selected building, space, asset and operational information for project handover and downstream use. The exact required format and data should follow the project's specified requirements.

Can COBie information be prepared from BIM models?

Yes. Suitable BIM information can contribute to COBie or structured handover data, particularly where model objects contain reliable project-defined parameters.

What other sources can be used?

Depending on project requirements, sources can include equipment schedules, asset registers, space schedules, approved submittals, O&M manuals, commissioning records and other closeout information.

Can existing COBie data be cleaned or validated?

Yes. Existing datasets can be reviewed for missing required fields, duplicate records, inconsistent identifiers, relationship issues and other project-defined validation rules.

Can asset data be linked back to BIM objects?

Yes. Where model structure and project identifiers permit, selected handover records can be aligned with corresponding BIM assets.

Does preparing COBie data guarantee compliance?

No. Compliance depends on the actual contract, information requirements, template, data rules, classification requirements, mandatory fields, validation process and final acceptance criteria. The dataset should therefore be reviewed against the specific project requirement.

COBie & Structured BIM Handover

Need to Prepare Asset & Facility Information for Final Handover?

Share your COBie template, owner requirements, BIM models, asset registers, equipment schedules and closeout documentation.

Send Handover Requirements WhatsApp Us
WA Discuss Your Project